Las Brisas Retaining Wall Project Update
Fender Marine Construction Blog
by Fender Marine
11M ago
Our team is currently working on building a retaining wall for the Las Brisas Resort property. Here are some progress photos of the work that we have done so far ..read more
Visit website
Top 7 Chemical Grouting and Soil Stabilization Companies
Fender Marine Construction Blog
by Fender Marine
1y ago
Top 7 chemical grouting and soil stabilization companies, chemical grouting also called permeation grouting, is one of the best ways to repair a Central Florida foundation issue that is closer to the surface. Solution grouts that are commonly used include acrylamides, polyurethanes, acrylates, epoxies, and sodium silicates. There are two major types of chemical grouting: structural and water control. This process transforms granular soils into sandstone-like masses by filling voids with a low viscosity, non-particulate grout. A sleeve also called a port pipe, is grouted into a pre-drilled hole ..read more
Visit website
Lake Colony Residential Seawall Construction
Fender Marine Construction Blog
by Fender Marine
1y ago
This is a residential seawall project by Fender Marine. It’s located inside the Lake Colony residential community in Maitland, FL ..read more
Visit website
Lake Beauty Deck Construction
Fender Marine Construction Blog
by Fender Marine
1y ago
This is a deck constructed by Fender Marine located in Lake Beauty park. It’s right in front of Orlando Health and will soon be open to the public ..read more
Visit website
Lake Weston Boardwalk Construction
Fender Marine Construction Blog
by Fender Marine
1y ago
This is a boardwalk project for the Lake Weston community. It’s an on-going project that will soon be finished and be open to the community ..read more
Visit website
Pedestrian Bridge Construction in Tinker Field
Fender Marine Construction Blog
by Fender Marine
1y ago
Fender Marine Construction was contracted to build a pedestrian bridge in Tinker Field, Orlando FL. Tinker Field is known for hosting the annual Electric Daisy Carnival and we were able to finish the bridge right before EDC so all the attendees will be able to enjoy the pedestrian bridge during the festival ..read more
Visit website
Fender Marine Completed Projects 7/25/22
Fender Marine Construction Blog
by Fender Marine
1y ago
Our team has completed several projects in the past week and here’s a quick overview of the 3 completed projects. Sunset Preserve Community Boat Ramp + Deck Riverside Oak Community Boat Ramp + Dock Here’s a video of the concrete pour for the boat ramp: Here’s a video of the finished boat ramp + deck: Secret Lake Park Boardwalk ..read more
Visit website
Kreger Boat House
Fender Marine Construction Blog
by Fender Marine
1y ago
We were contacted by John Kreger in Tavares after he saw the work that we did on Drew Farmer’s dock on the Dora Canal.  He was impressed with the work and needed to redesign his existing dock.  I went out and took a look and he had an old dock that was built parallel to his shoreline, the boat slip was narrow, and the roof was low and the boat slip length of 20′ was not long enough to house the homeowner’s longer boat.  His shoreline curved in and it was just very difficult to get his boat into the slip.  So, it was determined that a complete removal of the existing do ..read more
Visit website
Big Sand Lake Dock and Covered Deck Facility
Fender Marine Construction Blog
by Fender Marine
1y ago
Fender Marine Construction , the Orlando’s largest specialty Marine Contractor was contracted in 2021 to design and build the dock and covered deck facility on Big Sand Lake. The Jefferson Sand Lake Apartments on the east side of Big Sand Lake was constructed by Walker & Company, one of the finest General Contractors in Central Florida. The project consisted of (2) docks. (1) on Big Sand Lake with the second dock being a fixed dock on Lake Boo Boo, just off Turkey Lake Road on property that used to be a Yogi Bear KOA Campground years ago. The dock on Lake Boo Boo was constructed with a 4 ..read more
Visit website
Fender Marine Attends 31st Annual Mt Dora Lighted Boat Parade
Fender Marine Construction Blog
by Fender Marine
1y ago
This past Saturday the Fender Marine team attended the 31st Annual Mt Dora Lighted Boat Parade with our own pontoon boat. The boats were decorated with Christmas lights and other holiday lightings. The boat parade was very successful with over 30 boats each with its own unique and original light decorations. Our boat had a huge Christmas tree as well as our own Santa Claus on deck which everyone loved. Overall it was a great event and our team had a lot of fun with the decorations ..read more
Visit website

Follow Fender Marine Construction Blog on FeedSpot

Continue with Google
Continue with Apple
OR